Works plan

Coming soon

What is planned for the building, what it costs and what is in the repair fund.

Repair fund

€18,640.52

As of 31/10/2026

€295.38 comes in each month (€0.45/m²)

Planned in total €72,730.00

2030

Estimated cost
  • Küttesüsteemi tasakaalustaminePlanned€6,500

2029

  • Keldri niiskustõke ja drenaažPlanned€14,000

2028

  • Trepikodade värviminePlanned€9,600

2027

  • Katuse remontOtsus üldkoosolekul 11.12.2026; remondifond ja laenGetting quotes€38,400
  • Trepikoja 2 välisuksHääletus kuni 4.12.2026Planned€2,380

2026

  • Trepikoja 1 LED-valgustusDone€1,720
  • Katuse ülevaatusAkt 14.10.2026Done€450
  • Trepikoja 2 LED-valgustusDetsembrisIn progress€1,850